Használati útmutató Ruckus Wireless ZoneFlex T610
Ruckus Wireless
hozzáférési pont
ZoneFlex T610
Olvassa el alább 📖 a magyar nyelvű használati útmutatót Ruckus Wireless ZoneFlex T610 (4 oldal) a hozzáférési pont kategóriában. Ezt az útmutatót 5 ember találta hasznosnak és 2 felhasználó értékelte átlagosan 4.5 csillagra
Oldal 1/4
Copyright © 2016 Ruckus Wireless, Inc.
Published June 2016, Part Number 800-71230-001 Rev A
Page 1 of 4
T610 Access Point
Quick Setup Guide
This Quick Setup Guide provides step-by-step instructions on how to
field-install the Ruckus Wireless T610 access point (AP).
For detailed information on planning the installation, performing a site
survey, and operating the T610, refer to the ZoneFlex Outdoor Access
Point User Guide, available at https://support.ruckuswireless.com.
WARNING: Only trained and qualified personnel should be allowed to
install, replace, or service this equipment.
WARNING: Installation of this equipment must comply with local and
national electrical codes.
CAUTION: Make sure that you form a 80mm - 130mm (3”-5”) drip
loop in any cable that is attached to the AP or the building. This will
prevent water from running along the cable and entering the AP or the
building where the cable terminates.
CAUTION: Be sure that grounding is available and that it meets local
and national electrical codes. For additional lightning protection, use
lightning rods and lightning arrestors.
CAUTION: Make sure that proper lightning surge protection
precautions are taken according to local electrical code.
WARNING: Ruckus Wireless strongly recommends that you wear eye
protection before mounting the T610.
T HIS GUIDE IN O LTHER ANGUAGES
请从以下网站获得该指南的简体中文版
https://support.ruckuswireless.com.
Vous trouverez la version française de ce guide à l'adresse suivante
https://support.ruckuswireless.com.
こ の ガ イ ド の⽇本語版は https://support.ruckuswireless.com
で ご 覧 く だ さ い 。
이 가이드의 버전은 웹 사이트 한국어
( ) .https://support.ruckuswireless.com 에서 확인하시기 바랍니다
Veja a versão em português (Brasil) deste guia em
https://support.ruckuswireless.com.
Puede ver la versión en español (América Latina) de esta guía en
https://support.ruckuswireless.com.
BEFORE YOU BEGIN
Before deploying your Ruckus Wireless T610, verify that all items listed
in Package Contents are included in the package. If any item is
damaged or missing, notify your authorized Ruckus Wireless sales
representative. Also, make sure that you have the required hardware
and tools.
REQUIRED HARDWARE AND TOOLS
• Customer-supplied outdoor-rated three-wire (1-2mm2 or 14-
18AWG) AC cable
• 1/2” (13mm) flat-blade screwdriver or equivalent
• No. 2 Phillips screwdriver
• Small flat-blade screwdriver
• Torque wrench or torque screwdriver with sockets
• Long-nose pliers
• Electrical wire stripping and terminal crimping pliers
• Pipe or pole --OR-- a sturdy flat surface
• Electric drill with drill bits and customer-supplied wall anchors, flat
washers, and hex nuts for flat-surface mount
• Four factory-supplied 1/2” (12.7mm) wide stainless steel
adjustable clamps, 2.5” (63.5mm) diameter, for main mounting
bracket on smaller poles
• Ruler
PACKAGE CONTENTS
A complete T610 field installation package includes all of the items
listed below (see Figure 1for illustrations):
• T610 Access Point (A)
• Two M25 data cable glands (B)
• Ground wire with lug (C)
• Service Level Agreement/Limited Warranty Statement
• Declaration of Conformity
• Regulatory Statement
• Ruckus Wireless AP Getting Started Guide
• This Quick Setup Guide
Figure 1: Package Contents
NOTE: The outdoor AP Mounting Bracket and security cable are
optional accessories that must be purchased separately.
CAUTION! The minimum software revision for the T610
is ZoneDirector (ZD) 9.13.1 or later, or SmartZone (SZ) 3.4
or later, or standalone AP firmware 104.0 or later.
DO NOT CONNECT THE T610 TO A RUCKUS
WIRELESS ZONEDIRECTOR RUNNING 9.13 OR
EARLIER.
Copyright © 2016 Ruckus Wireless, Inc.
Published June 2016, Part Number 800-71230-001 Rev A
Page 2 of 4
S TEP 1: CONNECTING AND SEALING THE RJ-45
CABLES
Connect and seal the RJ-45 cable(s) using the M25 data cable gland
as shown in Figure 3.
WARNING: Do not use any PoE injector not tested and approved by
Ruckus Wireless to power the T610 Access Point.
WARNING: Do NOT plug PoE in power into the non-PoE Port (see
Figure 2).
Figure 2: T610 bottom view
1Feed the end of the cable through the sealing nut, rubber O-ring,
clamping ring assembly and cable gland base as shown in Figure
3.
Figure 3: RJ-45 cable and cable gland assembly
2Use a wide flat-blade screwdriver to remove the required (PoE IN)
blanking cap from the T610.
3Connect the cable to the Ethernet port on the T610.
4Tighten the cable gland base into the T610 chassis to 7 N.m or
62 in-lbs.
5Wrap the clamping ring assembly around the rubber O-ring. Make
sure that the clamping ring assembly fully encloses the rubber O-
ring.
6Seat the clamping ring assembly and rubber O-ring in the cable
gland base.
7Hand-tighten the sealing nut.
S TEP 2: ATTACHING THE U-JOINT BRACKET TO THE
MOUNTING BRACKET
NOTE: The following mounting instructions require purchase of
optional accessories that are not included in the standard T610
package. The outdoor AP Mounting Bracket and safety cable are
optional accessories that must be purchased separately.
1Position the U-joint bracket on the mounting bracket.
Figure 4: U-joint bracket attached horizontally to the mounting bracket
NOTE: Mount the U-joint bracket in any direction on the mounting
bracket, preferably to allow AP azimuth adjustments. Then the AP
bracket allows AP elevation adjustments.
2Use four 1/4-28 bolt and washer sets (A) to mount the U-joint
bracket (B) to the mounting bracket (C). Tighten the bolts to 9.5
N.m (7 ft-lbs).
3Continue with Step 3a: Attaching the Mounting Bracket to a
Flat Surface or Step 3b: Attaching the Mounting Bracket to a
Metal Pole.
S TEP 3A: ATTACHING THE MOUNTING BRACKET TO A
FLAT SURFACE
1Place the mounting bracket at the location on the flat surface
where you want to mount the AP. Use the holes on the mounting
bracket as a template to mark the locations of the mounting
holes.
Figure 5: Mounting bracket flat surface holes
2Remove the mounting bracket from the flat surface.
3Drill holes required for the mounting hardware.
NOTE: The hardware required for mounting to a wall are not included
in the mounting kit.
4Attach the mounting bracket to the flat surface using the
mounting hardware.
5Using the mounting hardware instructions, tighten the hardware to
secure the mounting bracket.
6Continue with Step 4: Mounting the Linkage Bracket to the U-
Joint Bracket.
S TEP 3B: ATTACHING THE MOUNTING BRACKET TO A
METAL POLE
1Insert the open end of one steel clamp into the upper two slots on
the mounting bracket.
2Take the other steel clamp and insert it into the lower two slots on
the mounting bracket.
NOTE: The clamps can be daisy-chained together to accommodate
larger poles.
3Use the clamps to attach the mounting bracket to the pole.
Tighten the clamps to 3 N.m or 27 in-lbs, or per manufacturer’s
specifications.
Figure 6: Attaching the mounting bracket to a vertical pole
4Continue with Step 4: Mounting the Linkage Bracket to the U-
Joint Bracket.
S TEP 4: MOUNTING THE L BINKAGE RACKET TO THE
U-JOINT BRACKET
The linkage bracket attaches to the U-joint bracket using an M8 bolt
and washer set. The linkage bracket is symmetrical, and either end
can be attached to the U-joint bracket.
NOTE: Make sure that linkage bracket is installed with its serrated
external-tooth lock washer on the inside of the U-joint bracket
flanges. This ensures that the azimuth adjustment does not
change.
1Loosely assemble the linkage bracket (A), the U-joint bracket (C),
one serrated external-tooth lock washer (B), and one M8 bolt
and washer set (D).
Cable gland base
Clamping ring assembly
Rubber O-ring
Sealing nut
C
B
A
Copyright © 2016 Ruckus Wireless, Inc.
Published June 2016, Part Number 800-71230-001 Rev A
Page 3 of 4
Figure 7: Attaching the linkage bracket to the U-joint bracket
2Set the azimuth required by the AP.
3Tighten the M8 bolt to 13.6 N-m (10 ft-lbs).
4Continue with Step 5: Attach the AP bracket to the linkage
bracket.
S TEP 5: ATTACH THE AP BRACKET TO THE LINKAGE
BRACKET
Attach the AP bracket to the linkage bracket using the included bolt,
nut, lock washer, flat washer, serrated external-tooth washer shown in
Figure 8.
The AP bracket attaches to the linkage bracket using an M8 bolt and
washer set. The linkage bracket is symmetrical, and either end can be
attached to the AP bracket.
NOTE: Make sure that linkage bracket is installed with its serrated
external-tooth lock washer on the inside of the AP bracket flanges.
This ensures that the elevation adjustment does not change.
1As described in Step 4: Mounting the Linkage Bracket to the
U-Joint Bracket, loosely assemble the AP bracket (shown in
Figure 9), the linkage bracket (A in Figure 7), the second
serrated external-tooth lock washer (B in Figure 7), and the
second M8 bolt and washer set (D in Figure 7).
Figure 8: Attach the linkage bracket to the AP bracket
S TEP 6: ATTACHING THE AP BRACKET TO THE
ACCESS POINT
1Place the AP bracket onto the back side of the AP so that the four
larger screw holes on the bracket align with the four screw holes
on the AP. Make sure that the end of the AP bracket with the
hoisting loop is on the same side as the AP PoE IN port.
Figure 9: Attaching the AP bracket to the AP
2Use four 0.5-inch x 0.250-28 hex bolts with split lock and flat
washer sets to mount the AP bracket to the AP. Tighten the bolts
to 2.5-3.0 N.m or 22-27 in-lbs.
CAUTION: Make sure that the screws are no longer than 0.5 inch.
If a screw is longer than 0.5 inch, it can damage the AP chassis.
3If required, suspend the AP by attaching a carabiner to the
hoisting loop on the AP bracket.
NOTE: This kit may include extra screws, nuts and washers. You
may use the extras wherever required.
4Continue with Step 7: Set the Elevation and Tighten Elevation
Bolt.
S -TEP 7: SET THE ELEVATION AND T EIGHTEN LEVA
TION BOLT
1Set the elevation required by the AP.
2Tighten the M8 bolt to 13.6 N-m (10 ft-lbs).
S TEP 8: EARTH GROUNDING THE AP
CAUTION: Make sure that earth grounding is available and that it
meets local and national electrical codes. For additional lightning
protection, use lightning rods and lightning arrestors.
NOTE: The color coding of ground wires varies by region. Before
completing this step, check your local wiring standards for
guidance.
• Using the factory-supplied ground wire and ground screw/
washer set, connect a good earth ground to the AP chassis
ground point (Figure 10).
CAUTION: The T610 AP includes one 12mm stainless steel M6x1
earth ground screw with split lock and flat washers. Make sure
that any replacement screw is no longer than 12mm. If a screw is
longer than 12mm, it can damage the AP chassis.
Figure 10: Connect good earth ground to AP here
S TEP 9: INSTALLING THE S CECURITY ABLE
NOTE: The security cable is an optional accessory that must be
purchased separately.
1Thread the security cable through the mounting bracket (A) and
through the eye on the cable itself (B), as shown in Figure 11.
2Attach the safety cable to the AP (C) in Figure 11.
Figure 11: Attaching the security cable
Congratulations! You have mounted your T610 access point.
A
C
B
D
Termékspecifikációk
Márka: | Ruckus Wireless |
Kategória: | hozzáférési pont |
Modell: | ZoneFlex T610 |
Szüksége van segítségre?
Ha segítségre van szüksége Ruckus Wireless ZoneFlex T610, tegyen fel kérdést alább, és más felhasználók válaszolnak Önnek
Útmutatók hozzáférési pont Ruckus Wireless
26 Augusztus 2024
26 Augusztus 2024
26 Augusztus 2024
26 Augusztus 2024
26 Augusztus 2024
26 Augusztus 2024
26 Augusztus 2024
26 Augusztus 2024
26 Augusztus 2024
26 Augusztus 2024
Útmutatók hozzáférési pont
- hozzáférési pont StarTech.com
- hozzáférési pont HP
- hozzáférési pont Ubiquiti Networks
- hozzáférési pont TP-Link
- hozzáférési pont Vimar
- hozzáférési pont Zebra
- hozzáférési pont TRENDnet
- hozzáférési pont Mercusys
- hozzáférési pont AVM
- hozzáférési pont Dell
- hozzáférési pont Crestron
- hozzáférési pont Lancom
- hozzáférési pont Juniper
- hozzáférési pont Speco Technologies
- hozzáférési pont Netgear
- hozzáférési pont V7
- hozzáférési pont Asus
- hozzáférési pont Renkforce
- hozzáférési pont Draytek
- hozzáférési pont Mikrotik
- hozzáférési pont ZyXEL
- hozzáférési pont Dahua Technology
- hozzáférési pont Devolo
- hozzáférési pont Planet
- hozzáférési pont Tenda
- hozzáférési pont Black Box
- hozzáférési pont Cisco
- hozzáférési pont Kingston
- hozzáférési pont Edimax
- hozzáférési pont Honeywell
- hozzáférési pont EnGenius
- hozzáférési pont Grandstream
- hozzáférési pont D-Link
- hozzáférési pont Media-Tech
- hozzáférési pont Moxa
- hozzáférési pont Lindy
- hozzáférési pont Cudy
- hozzáférési pont Homematic IP
- hozzáférési pont Mojo
- hozzáférési pont Linksys
- hozzáférési pont Sitecom
- hozzáférési pont Vivitek
- hozzáférési pont Allnet
- hozzáférési pont Allied Telesis
- hozzáférési pont Airlive
- hozzáférési pont Fortinet
- hozzáférési pont Techly
- hozzáférési pont Totolink
- hozzáférési pont Steren
- hozzáférési pont Netis
- hozzáférési pont Buffalo
- hozzáférési pont Macally
- hozzáférési pont LevelOne
- hozzáférési pont Aruba
- hozzáférési pont EQ3
- hozzáférési pont Hawking Technologies
- hozzáférési pont INCA
- hozzáférési pont Moog
- hozzáférési pont LigoWave
- hozzáférési pont Advantech
- hozzáférési pont Hercules
- hozzáférési pont Intellinet
- hozzáférési pont SMC
- hozzáférési pont CradlePoint
- hozzáférési pont Silex
- hozzáférési pont Aerohive
- hozzáférési pont WatchGuard
- hozzáférési pont NUVO
- hozzáférési pont IP-COM
- hozzáférési pont Syscom
- hozzáférési pont Meru
- hozzáférési pont Amped Wireless
- hozzáférési pont Cambium Networks
- hozzáférési pont 3Com
- hozzáférési pont Bintec-elmeg
- hozzáférési pont Mach Power
- hozzáférési pont Brocade
- hozzáférési pont ICC
- hozzáférési pont Insteon
- hozzáférési pont Comtrend
- hozzáférési pont Premiertek
- hozzáférési pont Extreme Networks
- hozzáférési pont Atlantis Land
- hozzáférési pont FlyingVoice
- hozzáférési pont Luxul
Legújabb útmutatók hozzáférési pont
12 December 2024
9 December 2024
9 December 2024
9 December 2024
14 Október 2024
13 Október 2024
12 Október 2024
9 Október 2024
8 Október 2024
5 Október 2024