Használati útmutató Sauter CJ P2

Olvassa el alább 📖 a magyar nyelvű használati útmutatót Sauter CJ P2 (6 oldal) a Mérőberendezések kategóriában. Ezt az útmutatót 2 ember találta hasznosnak és 2 felhasználó értékelte átlagosan 4.5 csillagra

Oldal 1/6
Sauter GmbH
Ziegelei 1
D-72336 Balingen
E-Mail: info@kern-sohn.com
Tel.: +49-[0]7433- 9933-0
Fax: +49-[0]7 - -433 9933 149
Internet: www.sauter.eu
Instruction Manual Junction Box
SAUTER CJ P
V. 1.0
01/2019
GB
CJ P- -e-1810 BA
2 CJ P- -e-1810 BA
GB
SAUTER CJ P
V. 1.0 01/2019
Instruction Manual Junction Box
Summarize:
1 Introduction .................................................................................................... 3
2 Warning notes ................................................................................................ 3
3 Short description ........................................................................................... 3
4 Available models 3 ............................................................................................
5 Mounting ......................................................................................................... 3
6 Electrical Connections .................................................................................. 4
6.1 CJ P2, CJ P4 and CJ P4PG ...................................................................................................... 4
6.2 CJ P6 and CJ P8 ....................................................................................................................... 4
6.3 Connect a 4 wire load cell to a 6 wire connector .................................................................. 4
6.4 Connect a 6 wire load cell to a 4 wire connector .................................................................. 5
6.5 Grounding ................................................................................................................................. 5
6.5.1 CJ P2 / CJ P4 / CJ P4PG ........................................................................................................... 5
6.5.2 CJ P6 / CJ P8 ............................................................................................................................. 5
7 Setup of the Scale .......................................................................................... 5
7.1 Adjustment ................................................................................................................................ 5
7.2 Corner adjustment .................................................................................................................... 6
8 Troubleshooting 6 .............................................................................................
8.1 The scale seems to be reading incorrectly: 6..........................................................................
8.2 The scale corner readings are not equal: .............................................................................. 6
8.3 The scale readings drift rapidly: ............................................................................................. 6
9 Certicate of Compliance .............................................................................. 6
CJ P- -e-1810 3 BA
1 Introduction
Please pay attention to the notes of the operating manual: read these operating manual
carefully before commissioning, even if you already have experience with SAUTER
products. After receiving the products, it should be checked in advance whether no
transport damage has occurred, whether the outer packaging or other parts or even
the article itself has been damaged. If any damage is evident, please inform SAUTER
GmbH immediately.
2 Warning notes
Observe the national accident prevention regulations. Not correct executed use of the
juction boxes can lead to serious injuries, death, material damage and personal
injuries. Use only by trained and experienced people. Never step under suspended
loads. Measuring cells with 4-Conductor cable will change their characteristic value
when shortened or extended the cable length.
3 Short description
Junction box allows to connect more then one load cell to one device. It is possible for
the all Junctions to be used with fewer load cells than for which they are designed. All
juctions are t for 4-wire and 6-wire load cells. The load cells used should be of the
same model, capacity and have the same rated output (mV/V).
4 Available models
Amount of
connections
Cable inlet
Ingress
protection
2
bend relief
IP65
4
bend relief
IP65
4
PG screw connection
IP65
6
bend relief
IP65
8
bend relief
IP65
5 Mounting
The Junction Box can be mounted through the 2 mounting holes (dia. 4mm).

Termékspecifikációk

Márka: Sauter
Kategória: Mérőberendezések
Modell: CJ P2

Szüksége van segítségre?

Ha segítségre van szüksége Sauter CJ P2, tegyen fel kérdést alább, és más felhasználók válaszolnak Önnek




Útmutatók Mérőberendezések Sauter

Útmutatók Mérőberendezések

Legújabb útmutatók Mérőberendezések