Használati útmutató Hozelock Sensor Controller 2212

Hozelock Öntözés szabályozás Sensor Controller 2212

Olvassa el alább 📖 a magyar nyelvű használati útmutatót Hozelock Sensor Controller 2212 (45 oldal) a Öntözés szabályozás kategóriában. Ezt az útmutatót 6 ember találta hasznosnak és 2 felhasználó értékelte átlagosan 4.5 csillagra

Oldal 1/45
2212
Sensor Controller
?
www.hozelock.com
Hozelock Ltd.
Midpoint Park, Birmingham,
B76 1AB. England
Tel: +44 (0) 121 313 1122
www.hozelock.com
33914-000
2
Year
guarantee
2
Sensor Controller
3 4
2
1
A
B
C
D
E
F
H
G
4
GB
A 21mm G½ (½”) Adaptor
B 26.5mm G¾ (¾”) Adaptor
C 33.3mm G1 (1”) Adaptor
D Duration dial
E LED indicator lights
F Water Now button - On/Off/Override
G Hose pipe connector
H Light Sensor
Installation & operating instructions
READ THESE INSTRUCTIONS CAREFU LLY BEFORE
ATTEMPTING TO USE THIS PRODUCT.
FAILURE TO OBSERVE THE FOLLOWING NOTICES MAY RESULT
IN INJURY OR PRODUCT DAMAGE
General information
THESE INSTRUCT IONS ARE ALSO AVAILABLE ON THE
HOZELOCK WEBSITE.
This product meets the requirem ents of IP44 and therefore can
be used in exposed weather cond itions.
This product is not suitable for supplying drinking water.
Threaded water connections are suitable for hand tightening
only.
This product can be fitted to mains water suppl y.
This product can be fitted to outdoor water butts or tanks that
have an inline filter fitted before the controller.
Installing the batteries
You must use Alkaline batt eries – altern atives will result in
incorrect operation.
1 Remove the fro nt panel as shown (Fig. 1), gripping the recessed
part and pulling towards you.
2 Insert 2 x 1.5v AA (LR6) batteries (Fig . 1) and replace the
controller front panel.
IMPORTANT: Rechargeab le bat ter ies must n ot be used.
3 Replace batteries each season. (max 8 m onths use, used twice a
day)
4 When batteries are installed t he motor will operate the internal
valve to check t hat it is ready for u se and the batteries install ed
have enough charg e to safely operate the valve
5 If the LED indicator flashes red, the batteries need to be
replaced.
Connecting the Sensor Controller to the tap
1 Choose the co rrect tap adapter (Fig . 3)
2 Using the correc t adapter(s), attach the controller to the tap and
tighten firm ly to avoid leaks. Do not use a spanner or other tool
to tighten as this might damage the threads. (Fig. 4)
3 Turn on the Tap.
How to set up the Sensor Controller - automatic
watering

Termékspecifikációk

Márka: Hozelock
Kategória: Öntözés szabályozás
Modell: Sensor Controller 2212

Szüksége van segítségre?

Ha segítségre van szüksége Hozelock Sensor Controller 2212, tegyen fel kérdést alább, és más felhasználók válaszolnak Önnek




Útmutatók Öntözés szabályozás Hozelock

Útmutatók Öntözés szabályozás

Legújabb útmutatók Öntözés szabályozás

Gardena

Gardena T 100 Útmutató

2 Január 2025
BaseTech

BaseTech 1530023 Útmutató

31 December 2025
Florabest

Florabest FLBC 9 Útmutató

13 Szeptember 2024
Vonroc

Vonroc WT502DC Útmutató

4 Szeptember 2024
Vonroc

Vonroc PS505XX Útmutató

4 Szeptember 2024
Florabest

Florabest IAN 71209 Útmutató

3 Szeptember 2024
Brandson

Brandson 306810 Útmutató

1 Szeptember 2024