Használati útmutató EluneVision Reference
EluneVision
Vetítővászon
Reference
Olvassa el alább 📖 a magyar nyelvű használati útmutatót EluneVision Reference (4 oldal) a Vetítővászon kategóriában. Ezt az útmutatót 4 ember találta hasznosnak és 2 felhasználó értékelte átlagosan 4.5 csillagra
Oldal 1/4
Instruction Manual for
Reference Acoustic Fixed Frame Screens
Thank you for purchasing a Reference Acoustic Fixed Frame projection
screen. Before use, please read the instructions carefully. After installation,
please store the instructions for future reference.
EluneVision
A Division of Edith-Min International Inc.
Visit our website for updated product information
www.EluneVision.com
About Contents of ackage P
Your product should come with the items shown below. Contact immediately
with your dealer if anything is missing. Keep the original packing materials
for future reshipment.
Long frame (2 pcs)
Short frame (2 pcs) Wall bracket (2 pcs)
5mm horizontal tension rod (4 pcs)
material tensioner
M5x40mm tapping screw with anchor (8 pcs)
1
5mm vertical tension rod (4 pcs) Corner joint connector (8 pcs)
M8x8mm corner connector screws (32 pcs) hexagon spanner (1 pcs)
Tension Hook (some)
1
Caution: Please follow these instructions carefully to ensure proper
maintenance of your product.
1 When hanging the screen up, make sure no other objects like power 、
switches occupy the space designated for your screen.
2 Frame are made of high quality aluminum and should be handled 、
carefully.
3 When not using the fixed frame for a long period of time, cover the 、
screen with a furniture sheet to protect it from dirt, grime, and paint
4 Use a soft cloth with warm water to remove any marks on the frame 、
or screen surface when cleaning.
5 Never use solutions or chemicals cleaners on the screen surface.、
6 Avoid touching screen directly with your fingers, tools or other sharp 、
objects.
7 Spare parts should be placed out of children's reach. In accordance 、
with household safety guidelines.
Short frame Long Frame Screen Fabric
Illustration
Front view Back view Side view
bottom view
2
( )Fig.1
( )2Join all four frame parts together. (fig.2)
( )Fig.2
Long frame
Push
Push
Corner joint
connector
Insert the exposed ends of the joint connectors into the short (vertical) frame
and align the four corners so that they meet at perfect 90 degree a ngles.
Push
Push
Short frame
Short frame
Installation Procedure
( )Fig.4
( )Fig.5
( )Fig.3
M8x8mm corner connector screws
3
(1) Insert corner joint connectors into the long (horizontal) frame. (see
fig.1)
( )3 Fasten the four angles together by using the screws included.
(See fig.3)
(4) Put the whole frame upside down and unwrap the fabric (see fig.4).
(NOTE: Avoid scraping the fabric when unwrapping)
(5) Push the screen tension rods gently through the sleeves according to
their corresponding lengths on each edge of the screen. (See fig.5)
(6) Slip the screen tension rods into the sleeves running along side of the
screen material. At the same time as you are inserting the rods, make sure
to slide at least one tensioner in between the sleeves. (see fig.6 & fig.7)
( )Fig.6
4
Termékspecifikációk
Márka: | EluneVision |
Kategória: | Vetítővászon |
Modell: | Reference |
Szüksége van segítségre?
Ha segítségre van szüksége EluneVision Reference, tegyen fel kérdést alább, és más felhasználók válaszolnak Önnek
Útmutatók Vetítővászon EluneVision
17 Augusztus 2024
17 Augusztus 2024
13 Augusztus 2024
10 Augusztus 2024
9 Augusztus 2024
9 Augusztus 2024
8 Augusztus 2024
Útmutatók Vetítővászon
- Vetítővászon Oregon Scientific
- Vetítővászon Instaal
- Vetítővászon Duronic
- Vetítővászon GPX
- Vetítővászon Optoma
- Vetítővászon Pyle
- Vetítővászon Projecta
- Vetítővászon Celexon
- Vetítővászon Draper
- Vetítővászon Vestel
- Vetítővászon Da-Lite
- Vetítővászon AV:link
- Vetítővászon Luxburg
- Vetítővászon Elite
- Vetítővászon Elite Screens
- Vetítővászon Lumene
- Vetítővászon Stewart
- Vetítővászon Avers
- Vetítővászon KHOMO GEAR
- Vetítővászon EPV
Legújabb útmutatók Vetítővászon
11 Október 2024
6 Október 2024
2 Október 2024
29 Szeptember 2024
29 Szeptember 2024
27 Szeptember 2024
26 Szeptember 2024
22 Szeptember 2024
11 Szeptember 2024
6 Szeptember 2024