Használati útmutató Elica Varna EVR636S2

Elica Páraelszívó Varna EVR636S2

Olvassa el alább 📖 a magyar nyelvű használati útmutatót Elica Varna EVR636S2 (24 oldal) a Páraelszívó kategóriában. Ezt az útmutatót 2 ember találta hasznosnak és 2 felhasználó értékelte átlagosan 4.5 csillagra

Oldal 1/24
Use, Care, and Installation Guide
Guide d’utilisation, d’entretien et d’installation
Guía de instalación, uso y mantenimiento
READ AND SAVE THESE INSTRUCTIONS
LISEZ CES INSTRUCTIONS ET CONSERVEZ-LES
READ AND SAVE THESE INSTRUCTIONS
Printed in Mexico
5
List of Materials
Parts supplied
Removing the packaging
CAUTION!
Removing the packaging
CAUTION:Wearglovestoprotectagainstsharpedges.First
remove the carton carefully and take out the duct cover.
CAUTION:Removecarefullytheglasscanopyfromthebox
and put it on a smooth safe surfaces.
Grasp the hood structure from the body and lift straight off the
box.
Remove and properly discard every carton and plastic wrap-
ping content in the package.
Remove parts out of the box, duct covers and other contents.
WARNING!
Removetheprotectivelmcoveringtheproductbefore
putting into operation.
Hoodcanopyassemblywithblower,transition.
2Halogenlamps.
2Greaselters.
Duct cover.
Hardwarebagwith:
Template.
Ductcoversupportbracket(1piece)
Use, care and installation guide
Woodscrews(6pieces-3/16”x1”3/4)
Hoodattachmentanchors
2 - 8x40 anchors
4 - 10x50 anchors
Assemblyscrews
2 - 2.9x6.5 mounting screws
2 - 3.5x9.5 mounting screws
Parts not supplied
Optional Accessories
DuctlessRecirculatingKit
TobeusedonlyintheDuctless(Recirculating)version
 includes:2charcoalltersanddeector
ProfessionalStainlessSteelGreaselter
Tools/Materials required
Wire nuts
Tapetomounttemplate
6”roundedmetalductlengthtosuitinstallation
Measuring tape
Pliers
Gloves
Knife
Safety glasses
Electricdrillwith5/16”and3/8”Bits
Strain relief
Spirit level
Duct tape
Screwdrivers:
Phillips(Posidrive)#2
Torx#2
Wire cutter/stripper
Masking tape
Hammer
Saw, jig saw or reciprocating saw
Dimensions and Clearances
*Ductless(Recirculating)versionOnly
**DuctingversionOnly
30” (76.2cm)
36” (91.2 cm
1½”
(4 cm)
20” (50.8 cm)
241/8
(61 cm)
10”
(25.4 cm)
7¼” (18.4 cm
*28
7/8” (73.3 cm) min
*421/16
” (106.9 cm) max
**283
/8” (72 cm) min
**38” (96.6 cm) max
6”
81/8” (20.7 cm
7
Mounting the duct cover bracket
Option A - Fixed heigh duct cover
Fromthehorizontallinetracedintheprevioussection,
 traceahorizontalparallellineasshownbelow.
Centerthebracketinthetophorizontallineandalignit
with the centerline, as described in the followinG
drawing.
Mark screw holes locations in the wall.
IMPORTANT. Check to be sure that holes locations are
leveled, and correctly centered by the vertical centerline.
Drill5/16”pilotholesinthemarkedlocations.
Install wall fastener anchors.
Drive wood screws, by hand, into the fasteners to allow an-
chors to expand. Remove screws.
Secure the bracket to the wall with wood screws and/or
fasteners.
Option B - Telescopic duct cover
Theductbracketshouldbeinstalledagainstthebackwall
andushwiththeceiling.Thisbracketwillholdthe
ductcoverinplaceatthetop(thisaextraaccessoryavailable
notincludedwiththehood).
Secure the bracket to the wall:
Alignthemarkedcenterlineonthebracketwiththe
centerline on the wall.
Mark 2 screw hole locations in the wall.
Drill5/16”pilotholesinthemarkedlocations.
Install wall fastener anchors.
Drive wood screws, by hand, into the fastener to allow
anchors to expand. Remove the screws.
Secure the bracket to the wall with wood screws and/or
fasteners.
Ceiling ducting
If the duct will vent straight up to the ceiling:
Use level to draw a line straight up, from the centerline on
the template to the ceiling.
Measureatleast4-12/16”fromthebackwalltothecircle
centerofan6-½”holeontheceiling.
Wall ducting
If ductwork will vent to rear:
Use a level to draw a line straight up from the centerline
on the template.
Measureatleast23-12/16”(themeasuremightvary
dependigontheelbowused)abovethepencillinethat]
indicates the bottom installation height, to the circle center
ofan6-½”diameterducthole(Holemaybeelongatedfor
 ductelbow).
House wiring location
Thejunctionboxislocatedonthetopleftsideofthehood.
Wiringshouldenterthebackwallatleast20”abovethe
bottomoftheinstallationheight,andwithin5-7/8”and
 4-7/8”oftheleftsideofthecenterline.
Centerline
Bracket line
27 28/32
Horizontalstraightpencilmarkedline
Desired installation height
VerticalCenterline
Ceiling
Wall
For ceiling vent ducting4
12/16”circlecenter
to wall
Ceiling
6½”diameterhole
FORWALLVENTDUCT Circle center at
2312/ 16”abovethe
marked bottom
pencil line
Horizontalstraight
pencil line

Termékspecifikációk

Márka: Elica
Kategória: Páraelszívó
Modell: Varna EVR636S2

Szüksége van segítségre?

Ha segítségre van szüksége Elica Varna EVR636S2, tegyen fel kérdést alább, és más felhasználók válaszolnak Önnek




Útmutatók Páraelszívó Elica

Útmutatók Páraelszívó

Legújabb útmutatók Páraelszívó

Atag

Atag WM 5 Útmutató

30 Március 2025
Smeg

Smeg CA60EPX Útmutató

30 Március 2025
CATA

CATA C GLAS H BK Útmutató

30 Március 2025
Smeg

Smeg STH650X Útmutató

30 Március 2025
Etna

Etna 4191 inox Útmutató

29 Március 2025
Miele

Miele da 249 1 Útmutató

29 Március 2025
Miele

Miele DA 420 UL Útmutató

29 Március 2025
AEG

AEG DK9160-W Útmutató

29 Március 2025